QUALIFICATION

  • B.Eng.(Hons.) in Mechanical (Pure) Engineering University Technoloy Of Malaysia, Skudai, Johor Darul Takzim
  • Registered Professional Engineer with The Board of Engineers Malaysia(2011)
  • Member with The Institution of Engineers Malaysia (2011)
  • SPAN Qualified Person
  • As the Practising Fire Plan Submission Engineer for Building Plan Approval Under theUBBL requirement (IEM)

EXPERIENCE

ProjectHandle

1) Midlife Refurbishment, Rectification, Overhaul, Coupling and Other Related Works of the Existing2- Car Trains & Procurement of 14 x New 4- Car Trains for Kelana Jaya Line

2)Project Mass Rapid Transit Lembah Kelang Jajaran 2 Sungai Buloh– Cyberjaya- Putrajaya (Elevated South 3 Station) MRT line2 DDC-SEPA Mechanical and Electrical Design

3) Mechanical&Electrical Consultantcy Services for the Design of Proposal 4

Depots for the Mass Rapid Transit System Feeder Bus Service.

4) Engineering Consultancy Services for the Construction of Bus Rapid Transit (BRT) Sunway Line

5) Cadangan Pembangunan Pendirian sebuah Kilang Setingkat yang Mengandungi 2 Blok Kilang 1 Tingkat, 1 Blok Pejabat, 1 Unit Pondok Pengawal, 5 unit rumah Sampah dan 1 Unit Pencawang Elektrik diatas sebahagian Lot29138, Mukim Bandar Serendah, Daerah Ulu Selangor,untuk tetuan UMW Corporation Sdn Bhd

6) Cadangan Pembinaan Datum Regalia yang mengandungi Kompleks Komersial & Pejabat Servis Apartment Pejabat Yayasan Raja Muda Selangor & Ruang Letak Kereta di Lot2, JalanPantinum 7/52, Seksyen 7, ShahAlam

7) Putra Heights, Phase5s – 226 Unit Strata ResidentialDevelopment

8) Pre-Engineering and Detailed Conceptual Plan for Bus Transit (BRT) Kuala Lumpur Klang

9) Proposed Double Storey Link House Development at Elmina Vale, Elmina West (EV1) (20’x60’– 341 units)

10) Cadangan Pembangunan 1 Blok Hotel Tambahan (300 Bilik), 1 Blok Pusat Persidangan, Konvensyen, Pameran beserta ruang Komersial sediaada dan mengubah suai blok Hotel Sediaada untuk Primula Beach Hotel, Bandar KualaTerengganu

2011– 2012  :   PROJECT DIRECTOR OF MEGAJATI CONSULT SDN BHD

Project Handle

1) Proposed 140 Unit Double Storey LinkHouse Phase1-9, Denai Alam, Seksyen

U16, ShahAlam, For Guthrie Propoerty Holding Berhad

2) Proposed Development At Chemar aEast (Lot 3001, 5712, 24331 & 24332) For 166 Units 2 & 3 Storey Link House, Pekan Bukit Kepayang, Mukim Rasah, Daerah Seremban, Negeri Sembilan Darul Khusus

3) Cadangan Membina Dan Menyiapkan 143Uni tRumah Link 2 Tingkat Di Fasa 5, Laman1, Bernam Jaya

4) Cadangan Pembangunan Hotel Bertaraf 5 Bintang Di Atas Lot PT 5507 Seluas 4.92 Pusat Dagangan AntarabangsaMelaka (MITC) Ayer Keroh, Mukim Bukit Katil & Mukim Bukit Baru, Daerah Melaka Tengah, Melaka

2008– 2011  :   SENIOR MECHANICAL ENGINEER OF MEGAJATI CONSULT SDN BHD

ProjectHandle

1) Politeknik Mersing, Johor (Pakej 2 : Kerja Bangunan Dan Kerja-kerja Berkaitan)

2) Pembinaan Kompleks KHEDN, Negeri Perlis

3) Cadangan Membina Dan Menyiapkan Pangkalan Unit Udara Polis Sungai Besi, KualaLumpur

4) Kompleks Unit Pencegahan Penyeludupan (UPP) Padang Besar, Perlis( Reka&Bina)

5) Cadangan Membina Dan Menyiapkan Hospital Rompin, Daerah Rompin Pahang

6) The refurbishment and Upgrading of Air Conditionin gSystem at Five(5) Underground Station for Kelana Jaya

2003– 2008  :   MECHANICALENGINEEROFMEGAJATICONSULTSDNBHD

Project Handle

1) Proposed Design, Build and prepare A Permanent National Agricultural Exhibition Complex, MAHA(Phase1) at the site Mardi Serdang For the Ministry of Agriculture.

2) Construction, Development and Maintenance of Knowledge Workers Development Institute (Phase 1) Comprises of 3 Storey Learning Centre Building Block, 2 Storey Student Centre Building Block, 4 Storey Enterprise Building Block at Lot PT12152 in Cyberjaya Flagship Zone.(Phase 1& 2)

3) Proposed Construction and Completion of a police station in Bayan Baru, Penang

4) Sistem Kereta Kabel, Gunung Mat Cincang, Langkawi, Kedah.

5) Propose development of Swettenham Port Pulau Pinang and lumut terminal

7) University Malaysia Sabah

8) Universiti Sains Malaysia (USM)– Bangunan/Peralatan HUSM

9) Projek Pembangunan RMKe-9 Di Universiti Teknologi Malaysia, Skudai, Johor

10) UiTM Cawangan Kedah, kampus Sg.Petani – Kompleks Asrama

11) Projek Pembaikian Rumah Api Lama One Fathom bank, Di Pelabuhan Klang Selangor

12) Consultancy services for proposed improvement to water supply system at Swettenham Pier Cruise Terminal

13) To provide consultancy service for LMT@ including conducting necessary study, Physical Testing & servey, Developing Detail Report & Presentation Detail design and drawing and preparing.

14) Engineering Procumbent, Construction and Commissioning , Of Bew Coal Unloading And Associated Bulk Material Handling System 1×1000 MW Coal Fired Power Plant At Tanjung Bin, Johor

15) To Provide Consultancy Service LMT2 Conducting Necessary Study Physical Testing & survey, developing Detail, Report @presentation, Detail Design And Drawing And Preparing Bill Of Quantity

16) Construction Of phase 2B(3) Expansion Of North Butterwoth Container Terminal Package 4- Construction Of container Yard

17)Front End Engineering Design For Solid Product Jetty ( SPJ)