QUALIFICATION

  • B.Sc. in Civil Engineering, University Southwestern Louisiana, U.S.A.

 

MEMBERSHIP OF ASSOCIATION

  • Registered Professional Engineer with Board of Engineer Malaysia.
  • Member of The Institution of Engineers, Malaysia.
  • Certified Professional in Erosion and Sediment Control

 

EXPERIENCE

2013 – Present

  • Associate Director , Khairi Consult Sdn Bhd

Responsible to manage the project assigned and to ensure all the projects are completed satisfactorily. Checking all the design, prepare technical and financial proposal and post contract management.

 

Proposed Development for Kota Elmina, 1,511.83 acres, Mukim Rawang, District of Gombak, Selangor Darul Ehsan.

  • Project Manager.
  • Responsible to design all the infrastructure works and liase with authorities.

Proposed Mix Development on Lot PTD 148153 (Kem Majidee), Mukim Plentong,  Negeri Johor Darul Takzim- 331 acres.

  • Project Manager.
  • Responsible to design all the infrastructure works and liase with authorities.
  • Chair the site meeting.
  • Provide headquarters support during construction.
  • Prepare Bill of Quantities for drainage.
  • Project cost RM 400 M.

 

2009  –  2013  Head Of Water Resources & Drainage , Khairi Consult Sdn. Bhd. 

Responsible to manage the department and staff to ensure all the projects assigned to the department are completed satisfactorily. Checking all the design, prepare technical and financial proposal and post contract management.

 

Cadangan Membina dan Menyiapkan Jalan Putrajaya ke Simpang 3 Jenderam/ Jalan Bangi Lama, Daerah Sepang, Selangor Pakej A Menaiktaraf Laluan B17 (Jalan Bangi lama/Jalan Reko), Daerah Hulu Langat

  • Responsible for hydrological and hydraulic detail design for bridges crossing, culverts and roadside drain and also liaison with authority. Provide head office support during construction.
  •  Prepare Erosion Soil control Plan and obtained JPS and JAS approval.
  • Project cost RM 70 M.

Cadangan Membina dan Menyiapkan Jalan dari Kg. Tuit Ke Mat Daling, Kuala Tahan, Jerantut, Pahang

  • Responsible for hydrological and hydraulic detail design for bridges crossing, culverts and roadside drain and also liaison with authority. Provide head office support during construction.
  • Prepare Erosion Soil control Plan and obtained JPS and JAS approval.
  • Project cost RM 280 M.

Cadangan Pembangunan Kem Batalion Infantri Tentera Darat di Lot PTD 13441, Batu Pahat, Johor Darul Takzim.

  • Responsible to design all the infrastructure works and liase with authorities.
  • Prepare Erosion Soil control Plan and obtained JPS and JAS approval.
  • Project cost RM 96.7 M.

Project Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh – Kajang. Package 6 :- Bandar Phoenix to Bandar Tun Hussein Onn Station

  •  Responsible for hydrological and hydraulic detail design for bridges crossing, culverts and roadside drain and also liaison with authority.
  • Responsible for preparing alignment and detail for wtaer pipe relocation.
  • Project cost RM 120 M.

Cadangan Membina Dan Menyiapkan Sebahagian Paip Air Retikulasi Bagi 5000 Ekar Ke Atas Tanah Kerajaan Di Bandar Seri Iskandar, Daerah Perak Tengah, Perak Darul Ridzuan. (Sept 2008 – Ogos 2011)

  •  Responsible to advise and check the design carry out by designer.
  • Attend meeting

Cadangan Menaiktaraf Jalan dari Tangkak Ke Jasin.

  • Responsible for preparing alignment and detail for water pipe relocation.
  • Project cost RM 16 M.

 

2002 – 2009  Senior EngineerKhairi Consult Sdn. Bhd. 

Malaysia Agro-Exposition Park Serdang (MAEPS), Phase II  for Malaysian Agriculture Research & Development Institute (MARDI), Serdang, Selangor Darul Ehsan.

  • Responsible to design all the infrastructure works and liase with authorities.
  • Prepare Erosion Soil control Plan and obtained JPS and JAS approval.
  • Provide headquarters support during construction.
  • Project cost RM 50 M.

Cadangan Menaiktaraf Jalan Haji Manan, Klang, Selangor.

  • Responsible for drainage design and water pipe relocation.
  • Project Cost RM  36 M

Design of Interchange at Pudu Road – Cheras Road – Tun Razak Road – Chan Sow Lin Road Intersection, Kuala Lumpur, Malaysia.

  •  Responsible for drainage design and water pipe relocation.
  • Project cost RM  40M.

Cadangan Membina dan Menyiapkan Jalan Kota Bahru – Kuala Krai Secara Reka dan Bina

  • Responsible for hydrological and hydraulic detail design for bridges crossing, culverts and roadside drain and also liaison with authority.
  • Prepare Erosion Soil control Plan and obtained JPS and JAS approval.
  • Project cost RM 1.4 B

Detailed Design and Supervision of Federal Route 3 (FR 3) from Jabor Jerangau Interchange to Sg. Ular Interchange, Kuantan, Pahang.

  • Responsible for hydrological and hydraulic detail design for bridges crossing, culverts and roadside drain and also liaison with authority.
  • Carried out hydraulic analaysis using HEC-RAS.
  • Analyze the backwater effect to the drainage system.
  • Project cost RM 100 M

Cadangan Membina dan Menyiapkan Kompleks Pejabat 1 Tingkat at Sg. Udang, Melaka.

  • Responsible for all infrastructures design and  liaison with authority and preapring tender document.
  • Prepare Erosion Soil control Plan and obtained JPS and JAS approval.
  • Project cost RM 30 M.

The Design, Construction, Equipping, Commissioning and Maintenance of Shah Alam Hospital (300 Beds)

  • Responsible for  detail design of infrastructure works and liaison with authority. Provide head office support during construction.
  • Project cost RM 450 M

Projek Menaiktaraf Jalan Masuk Ke Makmal Teknologi Akuatik, Puchong.

  •  Involve in drainage and water pipe relocation design
  • Hydrological and hydraulic design for river crossing and bridge section.
  • Prepare Bill of Quantities for drainage.
  • Involve in site problem solution.

Menaiktaraf Jalan Gopeng – Siputeh, Daerah Kinta, Perak Darul Ridzuan,

Pakej 2 : Membina Jalan Baru Batu Gajah By-Pass dan Menaiktaraf Jalan A108 Daerah Kinta,

  •  Responsible for water pipe relocation detail design.
  • Project cost RM 12 M.

Cadangan Pembangunan Kompleks Pendidikan di Atas Lot PT23743, Mukim Labu, Negeri Sembilan Darul Khusus

  • Responsible for  detail design of infrastructure works and liaison with authority and also provide head  office support during construction.
  • Design 9 nos. serial detention pond and existing stream improvement.
  • Prepare Erosion Soil control Plan and obtained JPS and JAS approval.
  • Coordinating with supplier for Bebo arch design.
  • Project cost RM 142 M.

Cadangan Membina Persimpangan Bertingkat di Persimpangan Jalan Pudu, Terowong/Jalan Imbi/Jalan Hang Tuah

  • Detailed drainage design using MASMA and water pipe relocation and also prepare Bill of Quantities’
  • Project cost RM 160 M

Cadangan Pindaan Pelan Induk Pengezonan Bandar Seri Iskandar (5000 acres), Di Atas Tanah Kerajaan, Mukim Bota dan Lambor Kanan, Daerah Perak Tengah, Perak Darul Ridzuan

  •  Assistant Project Manager
  • Involve in earthwork and drainage and also detention pond design using MASMA.
  • Project cost RM 300 M.

Cadangan Pembangunan Infrastruktur dan Utiliti di Ibu Pejabat Mardi, Serdang Selangor

  •  Involve in drainage and detention pond design using MASMA and software SWMM.
  • Prepare Bill of Quantities for drainage.

Cadangan Pembangunan Bercampur Bagi 245 acres di Atas Tanah Kerajaan Bandar Seri Iskandar, Mukim Bota, Daerah Perak Tengah, Perak Darul Ridzuan

  •  Assistant Project Manager
  • Involve in earthwork and drainage and also detention pond design using MASMA.

Cadangan Menaiktaraf Jalan Paya Terubong dari Jalan Air Itam/Bandar Baru Air Hitam ke Paya Terubong/ Jalan Relau, Pulau Pinang

  •  Involve in drainage design using MASMA.

Cadangan Perlaksanaan Program Khas Perumahan Pendapatan Rendah Negeri Johor Darul Takzim di Kawasan ‘B2’ – PTD 115727, 115726 & 1155592 Seluas 249 Ekar Batu 20, Jalan Kong-Kong, Mukim Plentong Daerah Johor Bahru.

  • Involve in drainage and detention pond design using MASMA and software SWMM.
  • Prepare Bill of Quantities for drainage.
  • Project cost RM 150 M.

Cadangan Membina dan Menyiapkan Kompleks Pejabat Pertanian Daerah di Seksyen 19, Bandar Baru Kuala Selangor, Daerah Kuala Selangor, Selangor Darul Ehsan.

  • Involve in infrastructure works design.
  • Project cost RM 30 M.

 

Projek Menaiktaraf Laluan Persekutuan 54, Sg. Buloh, Selangor

  • Involve in drainage design
  • Hydrological and hydraulic design for river crossing and bridge section.
  • Prepare SYABAS pipe relocation (1800mm dia) and detail
  • Prepare Bill of Quantities for drainage.
  • Head quarters support during Construction.
  • Prpject cost RM 170 M.

Projek Menaiktaraf Sg. Gasi Bagi Mengatasi Masalah Banjir di Laluan Persekutuan 54, Sg. Buloh, Selangor

  • Project Manager and support during construction
  • Hydrological and hydraulic design for river crossing and bridge section.
  • Prepare Bill of Quantities
  • Project cost RM 20 M.

Proposed Dhaka – Chittagong Highway, Dhaka, Bangladeshk

  • Drainage design team leader
  • Hydrological and hydraulic design for river crossing and bridge section.
  • Project Cost RM 14 B.

 

 1991 – 2002  Civil Engineer , Jurutera Consultan Sdn. Bhd.

Design and Build for Pembinaan  Asrama Untuk  6000 Pelajar di Universiti Teknologi Malaysia, Skudai, Johor.

  • Involve in design and prepare details for drainage system.
  • Project cost RM 150 M.

The Design, Construction, Equipping, Comissioning and Maintenance of 1,500 Beds Psychiatric Hospital Permai at Tampoi, Johor Darul Takzim.

  • Responsible for design drainage system and prepare details in accordance with Urban Stormwater Management Manual for Malaysia. (Manual Saliran Mesra Alam, MaSMA).
  • Project cost RM 500 M.

Detailed Engineering Planning and Design of Bukit China Drainage Scheme, Kota Bharu, Kelantan.

  • Project Manager
  • Responsible for hydrological and hydraulic analysis of drainage and design  and also prepare reports.
  • Prepare Land Acquisition plans.
  • Project cost RM 60 M.

 Cadangan Pembesaran Pelabuhan di Pelabuhan Barat, Pulau Lumut, Pelabuhan Kelang (Fasa 1)

  •  Responsible for liasing and getting approval for Certificates of Fitness from authorities.
  • Project cost RM 80 M.

Projek Jalan Lingkaran Dalam Johor Bahru, Johor Darul Takzim.

Pakej 1 – Persimpangan Bukit Meldrum ke Persimpangan Bertingkat Jalan Tebrau.

  •  Prepare final account

Wood Processing Complex by HIPA for Forest Industries (M) Sdn. Bhd at Hinheup District, Vientiane Province, Laos PDR.

  • Responsible for design, prepare drawings, and tender document for infrastructure works.

Cadangan Membina dan Menyiapkan  Kompleks Simpanan dan Pemprosessan Tepung Gandum untuk Tetuan Federal Flour Mills Berhad Di Atas Lot 1, (Seksyen 6), Westport, Pulau Indah, Kelang, Selangor Darul Ehsan

  •  Project coordinator and design team leader.
  • Prepare infrastructure drawings and tender document.
  • Project cost RM 50 M

Cadangan Membina dan Menyiapkan Makmal Menguji Keteguhan  dan Komponen-Komponen Kereta di Atas Lot 15 dan Sebahagian Lot 563, 564 & 570, Persiaran Kuala Selangor Seksyen 26, Shah Alam untuk Tetuan Perusahaan Otomobil Nasional Bhd.

  • Responsible for design, prepare drawings, and tender document for infrastructure works.
  • Liasing with authorities
  • Project cost RM 500,000

Star Light Rail Transit System 1 – Phase I and II. As Independent Checker

  • Checking civil and structure drawings. Prepare monthly progress and bankers report.

Peningkatan Kompleks  LKIM, Batu Maung.

  •  Responsible for design, prepare report, drawings and tender document for infrastructure works.

 Cadangan Pembangunan 6 Blok Pangsapuri 16 Tingkat for PKNS.

  •  Design infrastructure, coordination and attended site meeting.

Perliminary Study to Shift Out Government Office Outside K.L. i.e. Perang Besar, Janda Baik, Sepang and Port Dickson.

  • Involve in preliminary planning and costing for highway and infrastructure works.

North Butterworth Container Terminal

  • Design infrastructure.

Perai’s Flood Mitigation Study for Sg. Perai, Juru, Jejawi and Tengah.

  • Involve in hydrological and hydraulic modeling and prepare report using frequency analysis programme, Quattro Pro, RSWM and MIKE 11.

Taman Segar Phase II, Cheras

  •  Execution and Completion of Site Clearing , Earthworks, Drainage Works, Silt Retention Basin and All Associated Works, Phase II-C and D
  • Prepare tender evaluation report.

Seri Gombak Housing Development

  • Supply, Construction and Commissioning of a Complete Sewage Treatment System, Pumping Equipment and all Associated Works at The Sewage treatment Facility No. 3 (Stage 3)
  • Prepare tender evaluation report.

Bandar Baru Selayang – Phase 1B-1B.

  •  Involve in water reticulation, drainage and earthwork design.

Johor Bahru Inner Ring Road

  • Prepare setting out for the road.

Reclamation and Ancillary Work on the Eastern Foreshore of Penang Island (Contract Package 1B-3R and 1B-5)

  •  Engaged in hydrological and hydraulic calculation for rechanellisation of the proposed extension of Sg. Keluang, Sg. Dua Besar, I & P drain and Sg. Nipah.

Kota Tinggi Bypass

  •  Responsible for sign board sizing, wording and location.
  •  Johor Bahru – Kota Tinggi Road Improvement (Package 4 and 5)
  •  Assistant Project Manager
  • Involve in drainage design, signboard sizing, junction design and tender document preparation.

Ipoh Lumut Road Improvement (Package 2 and 5)

  • Responsible for hydrological and hydraulic calculation for culvert and river.
  • Head office support

Sungai Nibong Bridge at Jalan Relau/Coastal Road Interchange

  •  Prepare Tender Evaluation Report.

Johor Port Expansion Project (Phase III) Stage 2 and 3.

  • Project coodinator
  • Duties also include designing drain, hazardous waste pipe line and prepare tender document.Bayan Lepas Expressway

Bayan Lepas Expressway

  • Design drainage

Link Between Junction with Proposed Jalan Tanah Jambu Link & Diplomatic Housing Area. (Package 1 – Jalan Kebangsaan to Jalan Sg. Akar) (Package 2 – Jalan Sg. Akar to Jalan Tanah Jambu)

  •  Prepare Land Acquisition Plan and tender document.

1990 – 1991    Design Engineer , MMC-GTM Bina Sama Sdn. Bhd.                                                      

North South Interurban Toll Expressway Project – Package 5A.

  • Responsible for remedial work design, programming, monitoring  work progress and prepare monthly claim.
  •  Experience in Lotus 123, Dbase IV, Wordstars and OPLAN Programme.