Proposed Petaling Jaya Dispersal Link (PJD LINK)

Client:

PJD Link (M) Sdn Bhd

Project Status:

On Going

Project Cost:

RM 2.7 billion

Services Provided:

Independent Checking Engineer.

  • Checking and reviewing in relation to the functionality of the design
  • Checking and reviewing the detailed design and technical documents and issue certificates of closure before submission to LLM.
  • Review construction including method statements and temporary works
  • Verifying and certifying the Project Progress claims up to final account.
  • Review and analyse the risk management reports
  • Review the progress of the project and report on general progress, installation, resting and commisioning of the works.
Scope Of Works:

Supervision works for the construction of a new dual-two lane fully elevated expressway between the Bandar Utama Interchange and Bukit Jalil Highway at Bandar Kinrara. Approximate mainline distance of 14.4km and a total of 11.0km of directional ramps and loops at the various interchanges.