Our Experiences

"When you want to know how things really work, study them when they’re coming apart."

PAGE IS UNDER MAINTENANCE

We believe that by providing excellent services, we could accomplish our mission in meeting our clients’ needs as they are the core to our business growth, and it is best to keep their interest met, as the saying goes.

Domestic Experiences:

International Experiences:

Highway Projects

2nd Dhaka – Chittagong National Highway, Bangladesh.
Construction cost = USD1.5 billion.

Project Salient Points:

  • 218 km
  • 2-lane-dual-carriageway highway
  • 5 interchanges,
  • 3 mega bridges (500m to 1.5km in length)
  • 13 nos. of flyovers,

KCSB Scope of Services

  • Feasibility study
  • Prelim engineering design

Privatisation of the Zenica – Sarajevo Highway (Package 3), Bosnia & Herzegovina

This project involves in the upgrading of the existing 73km of the 2 lanes single carriageway road from Zenica to Sarajevo to a 4 lanes dual carriageway on a privatised basis. The total project cost is approximately USD400millions. KC is involved in the field of engineering design of the highway inclusive of the tolling equipment.

To undertake this project, KC has join-ventured with European based firms, Traser Roads & Bridges Co., Sarajevo and Darsh Consult, Munich, Germany.

Design of the Ulaveo Industrial Centre, Kokopa, Papua New Guinea

This project involved in the reconstruction of the industrial centre. This industrial centre is developed within a 64 hectare site, comprising of an admin. block, 112 units of 2 storey factory buildings, 42 units of staff quarters, 6 blocks of multi-storey tenants quarters and all the ancillary facilities.

KC acted as the lead consultant responsible for the project management, detailed engineering design, liaison & project coordination and supervision of the construction works.

Upgrading of Malaysian Student Halls in Melbourne, Australia.

Scope: Design works for structural elements
Client: Malaysian Ministry of Higher Education
Status: Completed in July 2009
Project Cost: USD15.4 millions

Significant Highlights:

Construction of a 4-storey building with

  • under croft car parking

  • student accommodation rooms

  • an associated administration

  • lounge and dining areas