Industry: Marine, Petrochemical, Renewable Energy Oil & Gas
Client:
PCSB-Hess BV
Public Works Department, Malaysia
Completed
RM 54.6 Million
The existing Federal Route No.6 in Penang was very winding and small, as the road was constructed along the contour of the hill. In this project the existing road is to be widened into 4 lanes and to be straightened at the critical area. In order to minimise of cutting the hill, a split level carriageway was proposed. This project involved many slope stabilisation as the widening required cutting of the existing hill. Amongst the stabilisation treatments adopted were soil nailing, micropile wall, caisson wall and reinforced concrete wall. The construction of road and slope stabilisation works were completed 8 years ago and until todate no sign of distress or failure occurred at site and the stabilisation treatments were effectively implemented.
PCSB-Hess BV
Lotte Chemical Titan Malaysia Sdn. Bhd
The information contained on this website is for general information purposes only. The information is provided by KHAIRI CONSULT SDN BHD and while we endeavour to keep the information up to date and correct as much as possible. When you visit or interact with our sites, services, applications, tools or messaging, we or our authorised service providers may use cookies, web beacons, and other similar technologies for storing information to help provide you with a better, faster and safer experience and for advertising purposes.
Copyright © KHAIRI CONSULT SDN. BHD. All right reserved.
Powered by Penxel Studio