Mass Rapid Transit Line 2: Sungai Buloh – Serdang – Putrajaya (SSP) Elevated South 3

Client:

MMC corporation Berhad- MMC-Gamuda Joint Venture

Project Status:

Construction (Viaduct & Station)

Project Cost:

RM 3.0 Billion

Services Provided:
  • Detail design and supervision

Scope Of Works:

Detail design and supervision for :-

  • Total Alignment Length – 9.9km
    1. V208 Package – 3.6km.
    2. V209 Package – 3. 7km
    3. V210 Package – 2.56km
  • Total Long Span Length -1km (4no.s)
    1. V209 Package – 0.1 km (1 no.s)
    2. V210 Package – 0.7km (2 no.s)
    3. V208 Package – 0.2km (1 no.s)
  • Total Surface Works {Road & Drainage)-10.3km
  • Utilities Relocation – 10.3km
  • 1 no.s Multi Storey Car park
  • 4 no.s TPPS3 km.