Building a Bridge On The North-South Expressway In Batu Arang Road – Batang Berjuntai, Gombak, Selangor

Client:

KR Selangor

Project Status:

Construction Stage

Project Cost:

RM 60 million

Services Provided:
  • Master planning
  • Investigation works
  • Detailed design
  • Preparation of contract documents
Scope Of Works:
  • Build a new bridge next to the existing bridge which is a three (3) lane dual carriageway structure.
  • Connecting the existing bridge is to be upgraded from a two (2) lane dual carriageway to four lane dual carriageway with 1.595 km total length.
  • New bridge and road to be constructed and upgraded respectively to JKR U5 standard