Construction Elevated Interchange at Tun Razak Road/ Cheras Road/ Chan Sow Lin Road, Kuala Lumpur

Client:

Kuala Lumpur City Hall

Project Status:

Completed

Project Cost:

RM 55 million

Services Provided:
  • Master planning
  • Conceptual Design
  • Preliminary Design
  • Detailed Design
Scope Of Works:

Ugrading of existing Jalan Chan Sow Lin, Jalan Cheras, Jalan Pudu and Jalan Tun Razak signalized junction into separated signalized six (6) spans flyover from Jalan Chan Sow Lin to Jalan Tun Razak (700m length including bridge and approach ramp) and Four (4) numbers of ramp down and up to this flayover at Jalan Cheras and Jalan Pudu