Construction Of A New Road From Kota Bharu To Kuala Krai, Kelantan Pakej 3A : Machang To Bukit Tiu

Client:

Public Works Department Malaysia

Project Status:

Construction Stage

Project Cost:

1.4 Billion

Services Provided:
  • Master planning
  • Conceptual Design
  • Preliminary Design
  • Detailed Design
Scope Of Works:

Design and construction of a new four (4) lanes dual carriageway road according to standards JKR R5 Packages :

  • Package 3A : Machang to Bukit Tiu (2.75km)
  • Package Bukit Tiu to Kg. Berangan Mek Nab (9.6km)
  • Package 3B : Kg. Berangan Mek Nab to Keroh (9.775km)
  • Package 3C : Keroh to Kuala Krai (8.1km)
  • Scope of works including earthwork, pavement work, road furnitures, interchange, bridges, vehicular box culverts, drainage system, environmental protection works, temporary works and relocation of utilities.

OTHER PROJECTS

Industry: Water Resources & Infrastructure
Client:

PLAN Malaysia (Jabatan Perancangan Bandar dan Desa)