Construction of bridge crossing ‘Sungai Tengah’ and ‘Sungai Daun’ including other associated works at Bkip 2 (Phase 1), Byram, Mukim 11, Seberang Perai Selatan, Pulau Pinang.

Client:

Perbadanan Pembangunan Pulau Pinang (Penang Development Corporation, PDC)

Project Status:

Completed

Project Cost:

RM 66.58 million

Services Provided:
  • Detail independent checking work for the design carried out by the main consultant inclusive of structure, geotechnical, as well as road and drainage.
  • Preparation and submission of ICE report to relevant local authorities.
Scope Of Works:
  • Independent checker for geotechnical, structure, road and drainage for the proposed bridge.
  • Bridge over Sg Matim (Total Span Length = 336m, Total Bridge Widening = 23.8m)
  • Bridge over Sg Tengah (Total Span Length = 100m, Total Bridge Widening = 31.0m)