Construction of Road From Pasir Raja, Hulu Dungun, Terengganu To Kampung Mat Daling, Jerantut, Pahang (Phase 3A & 3B)

Client:

Ministry Of Rural And Regional Development Malaysia

Project Status:

Design stage

Project Cost:

RM 455 Million

Services Provided:
  • Conceptual Design
  • Preliminary Design
  • Detailed Design
Scope Of Works:
  • Construction of a new 52km 2-lane-single carriageway road to the JKR R3 geometric standard.
  • Bridges construction works at specified location.
  • Ground treatment and slope protection works.
  • Drainage works including roadside drain, culverts etc.

OTHER PROJECTS